欧美精品一区二区三区mm-亚洲av乱码久久精品蜜桃-在线一区二区三区网址-亚洲不卡一区三区三区

Homegrown high-capacity impulse turbines to be installed in hydropower station in China’s Tibet

2023-06-12

Two homegrown impulse turbines, each with a maximum capacity of 500 megawatts, will be installed at the Datang Zala Hydropower Station in southwest China's Tibet Autonomous Region.? ?

China Datang Corporation Ltd., organizer of the research and development team of the turbines, made the announcement Friday at an event advancing the project.

Independently developed by China, the turbines can better utilize the high water head on the Yuqu River, where the power station is located.

The main section of the Datang Zala Hydropower Station started construction on Friday.? ?

The power station is scheduled to be put into operation in 2028.

It has a total installed capacity of 1.015 million kilowatts and a designed annual power generation capacity of 3.946 billion kilowatt hours.

Once completed, it can save 1.3 million tonnes of standard coal each year, and reduce carbon dioxide emissions by 3.42 million tonnes.


Copyright? www.mjyfzcl.com All Rights Reserved

Address: 1 Guaningbo St., Xicheng Dist., Beijing 100033

Email: cdt-info@china-cdt.com

CDT WeChat

CDT Micro-blog

Produced By CMS 網站群內容管理系統 publishdate:2025-06-07 12:07:00